Message or symptomWhat to do
“Impossible task in the past!”Lessons can only be placed today or later.
“Impossible task!”Drop the lesson exactly on a half-hour slot of the calendar.
“The group is already schedule at the same time…”Another lesson of the group overlaps. Move one of them.
“Select an activity type first!”Click an activity type tile (normally Ground).
“Duration exceed midnight!”Choose an earlier start time.
“This project can not be modified! It is Closed!”Reopen the project from the Projects window.
“No Project schedules to sync!”Nothing remains to synchronize in the chosen period.
A lesson stays in STOPRead the reasons in the results, fix the room, instructor, or time, and synchronize again. Use Bypass or Force Synchronize only for member conflicts you accept.
Synchronize is greyed outThe lesson has no instructor or no resource.
Delete or Un-sync is greyed outThe lesson is past or started, or it belongs to another group’s project.

Administrator checklist

  • ☐ Project created for the right group, with a clear title
  • ☐ Project resources and extra groups selected
  • ☐ All course lessons placed (faded lessons in the list show what is already planned)
  • ☐ No red “No instructor or resource set” icons left
  • ☐ Competency check run in the Grid list (no red marks)
  • ☐ Simulation run with no unexpected STOP
  • ☐ Synchronized for the next period, with notifications as desired
  • ☐ Weekly TIMETABLE printed or shared with students
  • ☐ Project closed when the course ends