22. Recommended operational workflows
22.1 Start-of-day maintenance control review
- Refresh Resources.
- Review missing-next-due icons, grounded/warning states, wrench, AMO, expected return, last position, and next schedule.
- Open Status board and work each exception section from the top.
- Review the first ten next-due resources.
- Check open tasks by registration.
- Review Risk Heatmap or Dashboard only after immediate release blockers are understood.
- Record ownership and due dates for follow-up.
[SCREENSHOT: maintenance-start-of-day | Capture: Resources and Status board prepared for the start-of-day review, with key exceptions highlighted.]
22.2 New pilot snag to maintenance visit
- Confirm the pilot snag and supporting file in Squawk Manager.
- Review whether it grounds the resource or has an approved postponement.
- Confirm aircraft position and next schedule.
- Send the resource to maintenance, selecting AMO and expected return when known.
- Add a task for coordination if ownership or a due date is needed.
- Add a temporary Scheduler block if a specific time window must be protected.
- Verify Resources and Status board.
[SCREENSHOT: maintenance-snag-to-visit | Capture: Pilot snag, Send to maintenance dialog, resulting resource row, and linked task.]
22.3 Maintenance completion and return to service review
- Confirm approved maintenance documentation outside this page.
- Enter correct closing date and explanation on each resolved squawk.
- Renew any item that remains controlled; do not conceal it in a closed record.
- Establish the next required TTSN item when applicable.
- Update data-sheet values only when reconciled.
- Remove obsolete temporary Scheduler blocks.
- Return the resource from maintenance.
- Refresh Status board and confirm no release blockers remain.
- Check the live Scheduler and Flight Record status.
- Close or update related tasks and add a History note when useful.
[SCREENSHOT: maintenance-return-to-service-check | Capture: Closed squawk, valid next due, cleared maintenance visit, clean Status board, and updated task.]
22.4 Weekly manager review
- Review Dashboard availability and lost-activity context.
- Review AMO turnaround and utilization with deliberate date ranges.
- Review pilot-squawk tags and Risk Heatmap trends.
- Review the AI report and its limitations when available.
- Open underlying squawks for every high-priority finding.
- Assign tasks for inspections, data corrections, or monitoring.
- Review OpenAviation Needs sync and failed Transfer History entries.
[SCREENSHOT: maintenance-weekly-review | Capture: Dashboard, Risk Heatmap, AI priorities, OpenAviation history, and Task tab as a weekly review sequence.]
23. Common questions and troubleshooting
| Situation | What to check |
|---|---|
| A resource is missing | Clear filters, reset selector filters, expand groups, enable Show inactives, and confirm restricted-view access. |
| The resource looks available but cannot ramp out | Check maintenance/AMO state, mandatory next due, grounded squawks, Scheduler unavailability, weekday/day-night restrictions, and Status board. |
| Send/return maintenance is disabled | Refresh and check the last position or in-flight state, current maintenance state, and your access. |
| A task disappeared | The resource shortcut filters to open tasks. Change the Closed/status filters or clear the registration filter. |
| Delete became inactive instead | The resource or AMO has history and is intentionally preserved. |
| Resource deletion is blocked | Existing schedules may need to be moved or deleted first. |
| A squawk is unexpectedly grounded | Check whether it has a valid approved date/TTSN limit and whether the earliest limit has expired. |
| A date-postponed squawk changed after the listed day | The date is inclusive; it expires after that calendar day. |
| A closed squawk still appears | Hide inactives/closed items, or keep them visible for historical review. |
| Cannot edit a pilot snag description | The original report is preserved. Use follow-up/closing text for clarification. |
| Pilot snag label does nothing | Select an eligible pilot snag row first. |
| Public/private upload did not appear | Confirm the rename prompt was completed, wait for upload, refresh the file list, and verify the correct registration/tab. |
| Scheduler block is absent | Refresh, navigate to the correct date, and confirm From/To. |
| Status board says No items found | That section currently has no exception; continue reviewing the remaining sections. |
| Heatmap shows a dash | No comparable tag result is available for that aircraft/period. |
| AI result conflicts with current knowledge | Check period, limitations, flight hours, original squawks, inspection findings, and current operational context. |
| OpenAviation says Needs sync | Double-click the row, inspect awaiting flights, review Daily records, then synchronize the narrowest appropriate range. |
| OpenAviation says Up to date but no flights occurred | This is expected: no eligible completed flight is waiting in the selected range. |
| OpenAviation says no eligible records | Check inclusive dates, completion, cancellation, and positive air time. |
| OpenAviation status did not change | Refresh, inspect Transfer History/details, and verify the transfer result before resubmitting. |
| A chart seems misleading | Confirm date range, units, hidden legend series, utilization, inactive-resource setting, and whether open visits are included. |
[SCREENSHOT: maintenance-troubleshooting | Capture: Composite target showing Reset filters, Show inactives, Status board blocker, closed-squawk toggle, Heatmap dash, and OpenAviation Transfer History.]
24. Final maintenance-control checklist
Before treating a resource as operationally available:
- Verify the registration and current aircraft position.
- Confirm there is no open grounding condition.
- Confirm every postponement has an approved, unexpired limit and adequate warning period.
- Confirm mandatory next-due control is present and valid.
- Confirm the aircraft is not still marked in maintenance or at an AMO.
- Confirm no temporary Scheduler unavailability covers the intended operation.
- Confirm day/night, weekday, restricted-view, and Scheduler display settings are appropriate.
- Refresh Status board and resolve every applicable No release entry.
- Confirm the official technical release and required records outside this page.
- Update or close tasks and record any continuing follow-up.
[SCREENSHOT: maintenance-final-release-checklist | Capture: One resource with a valid next due, no grounding squawk, no maintenance/AMO state, no Scheduler block, clean Status board, and no overdue open task.]