Checking availability

Published 9 October 2026, Updated 9 October 2026

Project resources and extra groups

Two selection lists appear below the calendar once a project is loaded:

  • Resources list: the rooms this project normally uses. They become the default filter for room searches. The list is saved with the project when you close the selector.
  • Groups list: other groups to include when checking student unavailability, for example a group that shares instructors or rooms. It is also saved with the project.

Availability shading button

The refresh icon button shades the calendar to show when you cannot schedule:

ClickLabel shownShaded slots
1stResources unavail. (grey)All the selected project resources are busy.
2ndGroup unavail. (green)A member of the project group is unavailable.
3rdAdd Sel. groups unavail. (blue)A member of the project group or of the selected extra groups is unavailable.
4thAdd Sel. groups project unavail. (dark blue)The selected extra groups already have lessons in another, not yet synchronized project.
5th(no label)Shading cleared.

Right-click the button to choose a mode directly or Clear. Hover over it for a reminder. The shading follows you as you scroll to other dates.

calendar with "Group unavail." shading active and the button label visible
calendar with “Group unavail.” shading active and the button label visible
right-click menu of the availability button
right-click menu of the availability button

Click Resources avail. (magnifier) to open the Resource availability window. Use it to find free rooms over a whole period before you place lessons.

OptionUseDefault
Date RangePeriod to search.Today plus one week
ResourcesRooms or resource types to check. Search by type is at the bottom of the list. Your choice also updates the project’s resource list.Project resources or ground resources
BaseLimit to one base.All bases
Time RangeDaily window, set with a slider in 30-minute steps.8:00 – 19:00
Length of scheduleMinimum length of the free slot.3 hr 00 min
Exclude daysDays to ignore.Saturdays and Sundays

Click the magnifier at the bottom of the window to run the search. Results are grouped by date, and the footer shows the total available slots. The other pager buttons collapse or expand all dates and switch the grouping on or off. Open full scheduler opens the live scheduler in a new tab.

Resource availability window with criteria filled and results grouped by date
Resource availability window with criteria filled and results grouped by date