{"id":5023,"date":"2026-10-11T08:57:57","date_gmt":"2026-10-11T12:57:57","guid":{"rendered":"https:\/\/www.airsupervision.com\/wp-r\/docs\/organization-staff\/event-report-center\/analysis-tabs-grid-view-schedule-spi-risk-heatmap-and-ai\/schedule\/"},"modified":"2026-10-11T08:57:57","modified_gmt":"2026-10-11T12:57:57","slug":"schedule","status":"publish","type":"docs","link":"https:\/\/www.airsupervision.com\/wp-r\/docs\/managers\/event-report-center\/analysis-tabs-grid-view-schedule-spi-risk-heatmap-and-ai\/schedule\/","title":{"rendered":"Schedule"},"content":{"rendered":"\n<p>The <strong>Schedule<\/strong> tab is the agenda of the corrective actions planned in the <strong>Security SMS<\/strong> section of the reports (the <strong>Sched close 1 to 4<\/strong> lines).<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/erc-schedule.png\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"1330\" height=\"820\" src=\"https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/erc-schedule.png\" alt=\"Schedule tab with the three-month calendar and the list of open actions, overdue ones in red\" class=\"wp-image-5001\" srcset=\"https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/erc-schedule.png 1330w, https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/erc-schedule-300x185.png 300w, https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/erc-schedule-1024x631.png 1024w, https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/erc-schedule-768x474.png 768w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><figcaption class=\"wp-element-caption\">Schedule tab with the three-month calendar and the list of open actions, overdue ones in red<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Area<\/th><th>What it shows<\/th><\/tr><\/thead><tbody><tr><td>Calendar (left)<\/td><td>Three months. Days with at least one projected action are highlighted. Use the arrows to change months; the list follows the months shown.<\/td><\/tr><tr><td>List (right)<\/td><td>Every <strong>open<\/strong> scheduled action in the months shown: report number, projected date, person in charge, creation date and the beginning of the report text.<\/td><\/tr><tr><td><strong>Red lines<\/strong><\/td><td>Actions past their projected date.<\/td><\/tr><tr><td>Red number in the tab title<\/td><td>How many shown actions are already overdue.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<ul>\n<li>Click a day in the calendar to highlight its actions in the list.<\/li>\n\n\n<li>Double-click a line to open the report in the <strong>Events<\/strong> tab, where you can set the <strong>Closing date<\/strong> of the action or send a reminder to the person in charge.<\/li>\n\n\n<li>An action disappears from the list as soon as its <strong>Closing date<\/strong> is filled in, or when the whole SMS file is closed.<\/li>\n<\/ul>\n\n\n\n<p><strong>When to use it:<\/strong> at the start of each week, review the red lines, send reminders, and close the actions that were done.<\/p>\n","protected":false},"featured_media":0,"parent":5019,"menu_order":2,"template":"","doc_tag":[],"_links":{"self":[{"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs\/5023"}],"collection":[{"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/types\/docs"}],"version-history":[{"count":0,"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs\/5023\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs\/5019"}],"next":[{"title":"SPI (Safety Performance Indicators)","link":"https:\/\/www.airsupervision.com\/wp-r\/docs\/managers\/event-report-center\/analysis-tabs-grid-view-schedule-spi-risk-heatmap-and-ai\/spi-safety-performance-indicators\/","href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs\/5024"}],"prev":[{"title":"Grid view","link":"https:\/\/www.airsupervision.com\/wp-r\/docs\/managers\/event-report-center\/analysis-tabs-grid-view-schedule-spi-risk-heatmap-and-ai\/grid-view\/","href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs\/5022"}],"wp:attachment":[{"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/media?parent=5023"}],"wp:term":[{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/doc_tag?post=5023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}