{"id":4810,"date":"2026-10-09T23:34:56","date_gmt":"2026-10-10T03:34:56","guid":{"rendered":"https:\/\/www.airsupervision.com\/wp-r\/docs\/organization-staff\/group-scheduler\/synchronizing-with-the-live-scheduler\/"},"modified":"2026-10-09T23:34:56","modified_gmt":"2026-10-10T03:34:56","slug":"synchronizing-with-the-live-scheduler","status":"publish","type":"docs","link":"https:\/\/www.airsupervision.com\/wp-r\/docs\/organization-staff\/group-scheduler\/synchronizing-with-the-live-scheduler\/","title":{"rendered":"Synchronizing with the live scheduler"},"content":{"rendered":"\n<p>Synchronizing publishes project lessons to the live scheduler. After synchronization, the room and instructor are booked, members see the lesson in their schedules, and the box gets the green <strong>Synced<\/strong> check.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"before-you-synchronize\">Before you synchronize<\/h2>\n\n\n\n<p>Every lesson needs <strong>an instructor and a resource<\/strong>. The system checks each lesson and can return these results:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Result<\/th><th>Typical reasons<\/th><\/tr><\/thead><tbody><tr><td><strong>STOP<\/strong> (not synchronized)<\/td><td>&#8220;This schedule is past.&#8221; \u00b7 &#8220;Resource is mandatory.&#8221; \u00b7 &#8220;Instructor is mandatory.&#8221; \u00b7 &#8220;Resource is not available.&#8221; \u00b7 &#8220;Instructor is not available.&#8221; \u00b7 &#8220;Group is not available.&#8221; \u00b7 a member &#8220;not available from \u2026 to \u2026&#8221; \u00b7 &#8220;This schedule has already started, modification not allowed.&#8221;<\/td><\/tr><tr><td><strong>WARN<\/strong> (synchronized anyway)<\/td><td>Instructor role or competency missing or expired \u00b7 the schedule belongs to another group \u00b7 member unavailability when <strong>Bypass<\/strong> is used.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"sync-all\">Sync all<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Check or clear <strong>Send notification<\/strong> next to the button. When it is checked, the people concerned are notified of the new schedules.<\/li>\n\n\n\n<li>Click <strong>Sync all<\/strong> (green link icon).<\/li>\n\n\n\n<li>In the confirmation:\n<ul class=\"wp-block-list\">\n<li><strong>Date range<\/strong>: the period to publish (default: today plus one week). Past lessons are never synchronized.<\/li>\n\n\n\n<li><strong>Bypass<\/strong>: when checked, member unavailability is shown as a warning instead of blocking.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>Choose:\n<ul class=\"wp-block-list\">\n<li><strong>Simulation<\/strong>: shows the errors and warnings <strong>without publishing anything<\/strong>.<\/li>\n\n\n\n<li><strong>Sync<\/strong>: publishes every lesson that passes the checks and lists the others.<\/li>\n\n\n\n<li><strong>Cancel<\/strong>.<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/gs-sync-confirm.png\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"413\" height=\"307\" src=\"https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/gs-sync-confirm.png\" alt=\"Sync all confirmation with Simulation\/Sync explanation, Bypass checkbox and Date range\" class=\"wp-image-4801\" srcset=\"https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/gs-sync-confirm.png 413w, https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/gs-sync-confirm-300x223.png 300w\" sizes=\"(max-width: 413px) 100vw, 413px\" \/><\/a><figcaption class=\"wp-element-caption\">Sync all confirmation with Simulation\/Sync explanation, Bypass checkbox and Date range<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"synchronization-results\">Synchronization results<\/h2>\n\n\n\n<p>The <strong>Synchronization results<\/strong> (or <strong>Simulation Synchronization results<\/strong>) window lists, under &#8220;Sync at : time&#8221;, one line per lesson:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>DONE<\/strong> (green): synchronized, or would be in a simulation.<\/li>\n\n\n\n<li><strong>STOP<\/strong> (red): not synchronized, with the reasons below the lesson title.<\/li>\n<\/ul>\n\n\n\n<p>Click a line to jump to the lesson on the calendar, where it blinks briefly. <strong>Clear<\/strong> empties the window and <strong>Close<\/strong> hides it. Synchronized boxes switch immediately to the synced appearance.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/gs-sync-results.png\" target=\"_blank\" rel=\"noreferrer noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"563\" height=\"556\" src=\"https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/gs-sync-results.png\" alt=\"Synchronization results window with DONE and STOP lines and their reasons\" class=\"wp-image-4802\" srcset=\"https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/gs-sync-results.png 563w, https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/gs-sync-results-300x296.png 300w, https:\/\/www.airsupervision.com\/wp-r\/wp-content\/uploads\/2026\/10\/gs-sync-results-100x100.png 100w\" sizes=\"(max-width: 563px) 100vw, 563px\" \/><\/a><figcaption class=\"wp-element-caption\">Synchronization results window with DONE and STOP lines and their reasons<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"synchronize-one-lesson\">Synchronize one lesson<\/h2>\n\n\n\n<p>Right-click a project box and choose <strong>Synchronize<\/strong>, or <strong>Force Synchronize (no members check)<\/strong> when a member conflict is acceptable. In the Grid list, select a row and click <strong>Sync (no bypass)<\/strong>.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p><strong>Good practice:<\/strong> run a <strong>Simulation<\/strong> for the next weeks every time you finish a planning session. Synchronize in rolling periods (for example two weeks at a time) so last-minute room or instructor changes stay in the project until you are sure.<\/p>\n<\/blockquote>\n","protected":false},"featured_media":0,"parent":4803,"menu_order":7,"template":"","doc_tag":[],"_links":{"self":[{"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs\/4810"}],"collection":[{"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/types\/docs"}],"version-history":[{"count":0,"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs\/4810\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs\/4803"}],"next":[{"title":"Managing synced (live) schedules","link":"https:\/\/www.airsupervision.com\/wp-r\/docs\/organization-staff\/group-scheduler\/managing-synced-live-schedules\/","href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs\/4811"}],"prev":[{"title":"Working in the Grid list","link":"https:\/\/www.airsupervision.com\/wp-r\/docs\/organization-staff\/group-scheduler\/working-in-the-grid-list\/","href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/docs\/4809"}],"wp:attachment":[{"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/media?parent=4810"}],"wp:term":[{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/www.airsupervision.com\/wp-r\/wp-json\/wp\/v2\/doc_tag?post=4810"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}